A renovation is the easiest time to add electric floor heating. If the floor is coming up or a new slab is going in, the heating cable goes in at the same stage, and your electrician and tiler work around it as part of the normal job. Doing it later means lifting a floor you have just finished.
P.A.P. has specialised in floor heating since 1988, and we are the exclusive Australian importer of ELEKTRA. This guide covers which system suits which floor heating renovation, how to plan it, and what to sort out with your trades before work starts.
Why a floor heating renovation is easier than a retrofit
Electric floor heating sits under the floor finish, in self-leveller, screed or concrete. In a renovation, the old floor is coming up and a new one is going down anyway. Adding the heating cable is one extra step in a job that is already happening.
Once the tiles are down and the walls are sheeted, that changes. You would need to lift the floor and open walls to run wiring. So if there is any chance you want floor heating, plan it before demolition starts.
Which system suits your renovation?
There are three ways to heat a floor with ELEKTRA cable. The right one depends on what is happening to the floor in your renovation.
Under-tile heating: bathrooms, ensuites, laundries and kitchens
If you are retiling, under-tile heating is the usual choice. We use ELEKTRA DM20, a twin-conductor heating cable about 4 mm thick that puts out 20 W per lineal metre. It is laid at 100 mm centres as standard, or 110 to 120 mm for lower output.
The cable is covered with self-leveller or sand-cement screed, then tiled as normal. It never goes in tile adhesive. Installed correctly, it warms up in around 30 to 60 minutes, which suits rooms you use for a few hours at a time.
In-screed heating: over an existing slab
If the renovation includes a deeper screed over an existing slab, in-screed heating uses the same DM20 cable set deeper in the screed. It suits living areas, large format tiles and polished concrete toppings.
It takes longer to warm up than under-tile heating, depending on the screed depth, but the extra mass holds heat for longer once it is warm.
In-slab heating: extensions and new slabs
If your renovation includes a new concrete slab, such as a ground floor extension, in-slab heating is an option. ELEKTRA VCD35 is a twin-conductor cable rated at 35 W per lineal metre. It is tied to the top reinforcing mesh at 200 mm centres before the pour, with 50 mm of concrete cover, and never crosses an expansion joint.
The whole slab becomes the heater. It takes hours to warm up and holds the heat, so it suits off-peak tariffs and daytime solar. The slab rests for 30 days after the pour before the heating is turned on.
Planning floor heating into your renovation
Most problems we see come from finding out about floor heating too late. Sort these out before the trades start.
Get a layout early. Send us the plans. We draw the layout and list the load for each zone, free, within 24 hours. The layout keeps clear of vanities, toilets and cabinetry.
Give the electrician the loads. How the circuits are arranged is your electrician's call. Our drawing gives them the load for each zone so they can plan the switchboard.
Pick thermostat positions. Every zone has its own thermostat with a floor sensor. Decide where each one goes so the electrician can run a draw wire at rough-in, before the walls are sheeted.
Tell the tiler. The tiler covers the cable with self-leveller or screed before tiling, so they need to allow for that step.
Choose your controls. Options range from simple thermostats to touch screen programmable and Wi-Fi models. Your electrician needs to know which one you want before fit-off.
How the installation runs
Your electrician runs a draw wire to each thermostat position at rough-in.
The cable is tested before laying, laid to the layout, and tested again. A bathroom takes a couple of hours to lay. Tying a whole-house slab takes about half a day.
The floor sensor goes in a capped conduit, so it can be replaced later without lifting tiles.
The tiler covers the cable with self-leveller or screed while a break alarm stays connected, and the cable is tested again after covering. For in-slab, the concrete is poured over the mesh.
After the floor coverings are down, the electrician fits off the thermostat like a normal power point.
Kits ship overnight once confirmed, with the installation guide, manuals and test sheets.
How much does it cost to run?
An average bathroom of about 3 m² draws around 600 W. At 27 cents per kWh, that is about 16 cents per heating hour. Most owners run a bathroom 4 to 6 hours a day in winter, about 65 cents to $1 a day, and turn it off in summer.
Larger areas cost more because running cost scales with area and hours. Off-peak rates are roughly half standard, which suits in-slab heating. Use our running cost calculator for your own rooms.
Built to last under a new floor
Once the cable is under your new floor, you want to forget about it. ELEKTRA has made heating cable in Poland since 1985 in an ISO 9001 factory. Every cable is tested before it leaves the factory, including a 2,500 V AC high-voltage test. DM20 and VCD35 both carry a 20 year warranty.
Common questions
Can I add floor heating to an existing concrete slab?
Not inside the slab. In-slab cable has to be tied to the mesh before the pour. Over an existing slab, the options are under-tile heating or in-screed heating in a new screed layer.
Can I heat just one room?
Yes. Many renovations heat only the bathroom or ensuite. Each zone has its own thermostat.
Does floor heating go in tile adhesive?
No. DM20 goes in self-leveller or sand-cement screed, never in tile adhesive.
Who connects it?
A licensed electrician. They fit off the thermostat like a normal power point once the floor coverings are down.
Planning a renovation?
Build your heating kit with our quote by room tool, or send your plans through our contact page for a free layout and the loads for your electrician within 24 hours. You can also phone (02) 6242 9310 or email info@papheatingsolutions.com.au.