Why Summer Is the Time to Plan Your Floor Heating

Most people start looking at floor heating on the first cold morning in May. By then the bathroom is already tiled, the slab is already poured and the trades are booked out. Summer is the easier time to get it right.

Renovations happen in summer

A lot of bathrooms, kitchens and extensions are done between spring and autumn. If the floor is coming up anyway, adding under-tile heating is a small step. The cable goes down after the waterproofing and before the tiles, and laying a bathroom takes a couple of hours.

Once the tiles are down, adding heating means lifting them again. Planning it at the start is the whole trick.

Slabs need lead time

For a new build or extension, in-slab heating must be planned before the pour. The slab then needs 30 days to rest before the heating is turned on. A slab poured over summer is ready well before winter.

What needs to happen, in order

  1. Layout. Send us your plans or use the kit builder. We draw the layout, keep the cable clear of vanities, toilets and cabinetry, and list the load for each zone. Free, within 24 hours.

  2. Electrician at rough-in. The electrician runs a draw wire before the walls are sheeted, so the cable can be pulled up to the thermostat.

  3. Laying and testing. The cable is tested before it is laid, after it is laid and after it is covered, with a break alarm on while the floor is covered.

  4. Covering. The tiler covers the tested cable with self-leveller or screed, then tiles as normal. For in-slab, the concrete is poured over the mesh.

  5. Fit-off. After the floor coverings are down, the electrician fits the thermostat off like a normal power point.

Builders and trades have more room

Trades are busy all year, but the rush for heating comes with the cold. Planning in summer means your layout, delivery and install are not squeezed into the same weeks as everyone else's.

Try it before you need it

Once the thermostat is fitted off, set the program and get to know it while the weather is mild. When the first cold morning arrives, the floor is already warm. See the thermostat range, including Wi-Fi models you can run from your phone.

Shipping

Once your kit is confirmed, it is sent overnight with the installation guide, manuals and test sheets.

Get a layout for your floor

Use the kit builder to pick your rooms, floor sizes, floor finish and thermostat. An ELEKTRA specialist then calls you to check the kit. If you have plans, send them through and we will draw the layout and work out the loads for your electrician, free, within 24 hours. Call (02) 6242 9310 or email info@papheatingsolutions.com.au.

Previous
Previous

Going Off Gas? Electric Floor Heating for an All-Electric Home

Next
Next

Bathroom Floor Heating for Renovators: Add It While the Tiles Are Up